As-Built Drawings reflect all changes made in the specifications and working drawings during the construction process, and show the exact dimensions, geometry, and location of all elements of the work completed under the contract. Also called record drawings or just as-builts. On building projects it is common for changes to be made during construction because of circumstances that emerge on site. These changes can be relatively minor or can be very significant.

Do you provide on-site surveying and measuring?

Yes we do. Kindly click here for more information.

Can you survey elements that are hidden on site?

No. We can only survey components that are visible to human eye.

Which discipline do you provide this service to?

  • Architectural.
  • Structural.
  • MEP (M&E).

What is the price?

SGD120 to SGD250 per sheet.
*Price are subjected to change depending on complexity.

Any other quote options?

  • Per sheet basis.
  • Per project basis.

How long will it take?

4-5 working days.
*Delivery time are subjected to change depending on complexity.
*Delivery time not including site survey/measurement.

What do I need to provide?

  • Existing drawings in AutoCAD (DWG) if any.
  • Red line mark ups of suspects changes.

What will I get?

  • 2D Working File.
  • PDF file.
  • 1 Amendments or Revisions Free.

Advantages

Process Safety Management

Convenient A&A works

Efficient Maintenance

Faster Repairs

Need Help? Chat with us